Suspended : Charging ratio. >100% = more time left-after-full than active charging. Hotel/mall pattern β install idle fee.
β οΈ EXCLUDED (stale)
Status never changed since polling began. Hidden from rankings until first transition detected (then counted from wake-up moment). Toggle "Show excluded" to view.
How to read: connected = plugged in (any state). charging = actually drawing power. ghost = connected β charging (occupying spot, not getting energy). Score uses charging only (real demand). Real-time data only Β· plan city-by-city via the Cities tab. Over β¦. Refreshed weekly Sun 04:00 UTC.
Loadingβ¦
#β
Srcβ
Stationβ
Cityβ
Powerβ
Tags
Charging % (of connected)
Chargingβ
Iso(km)β
Scoreβ
Loadingβ¦
#β
Cityβ
Stationsβ
Speed mix
Avg chargingβ
Avg ghostβ
Demand scoreβ
Best target
Suggestion
Loadingβ¦
Source: 14d Kilowatt + accumulating FastVolt snapshots Β· real-time only Β· raw JSON